Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

WAP-7 - दिल तुझपे कुर्बान

Search Forum
Filters:
Page#    176804 Blog Entries  <<prev  next>>
Rail Fanning
14613 views
12

★★
Jun 23 (19:57)   12202/Kochuveli - Mumbai LTT Garib Rath Express (PT) | VARD/Vaikom Road (3 PFs) | TATA/WAP-7/37212
SreenathSree^~
SreenathSree^~   8549 blog posts
Entry# 6104160            Tags   Past Edits
1 compliments
Great
The maiden LHB Run of LTT Garib Rath.. Starting a New Era..

For Full Video - click here

Crew Acknowledging with Headlights ON ,Huge Offlink SER TATANAGAR WAP 7 37212 incharge
...
more...
the first LHB run of SR 12202 KCVL- LTT Garib Rath Express pssinga VARD Outskirts

Vaikom Road (VARD), Southern Railway(SR)

Translate to English
Translate to Hindi

1 Posts

7763 views
1

Yesterday (05:35)
akkutheraillover~
akkutheraillover~   3511 blog posts
Re# 6104160-2              
It's first lhb garib rath who have Chair car also🙂
Translate to English
Translate to Hindi
Rail Fanning
17336 views
7

Jun 23 (12:13)   20888/Varanasi - Ranchi Vande Bharat Express | BSB/Varanasi Junction (11 PFs)
ShivaankVaibhav~
ShivaankVaibhav~   971 blog posts
Entry# 6103757            Tags   Past Edits
1 compliments
Great
Pictures from my return trip in 20888 from Varanasi to Bokaro. Evening snacks & dinner were good. Journey till Son Nagar was just overtaking & crossing WAG 12 led freight train. The best thing was maintaining 130 speed throughout the route. However, we were slowed few a time near some construction site.
Pic 1 : Coach interior
Pic 2 : Dep. from DDU
Pic
...
more...
3,4 : Evening snacks
Pic 5,6,7 : DFC section
Pic 8 : 130 action
Pic 9 : Dinner
Pic 10,11,12 : Standing at BKSC
DOJ : 12.06.24

Translate to English
Translate to Hindi

10031 views
1

Yesterday (01:37)
Sunil Kumar Bhardwaj^~   6259 blog posts
Re# 6103757-1              
1 compliments
Agree
Still waiting for IR to revise its TT and give GMO halt.
Translate to English
Translate to Hindi
Rail Fanning
17717 views
12

★★
Jun 23 (18:28)   TATA/Tatanagar Junction (6 PFs) | DD/WAG-9HC/38552
piy07~
piy07~   256 blog posts
Entry# 6104003            Tags   Past Edits
4 compliments
Great Great Great Thanks
Was Daund G9 38552 spotted anywhere next ?
Crossed Tata on 16.6.24
Translate to English
Translate to Hindi

5 Posts

12620 views
1

Jun 23 (23:20)
piy07~
piy07~   256 blog posts
Re# 6104003-6              
Is it the 1st alloted loco of DD?
Translate to English
Translate to Hindi
Rail Fanning
8594 views
1

Jun 23 (21:43)   BTC/Balaghat Junction (3 PFs) | LGD/WAG-9HC/33573
IrtaquaAkhter^~
IrtaquaAkhter^~   1548 blog posts
Entry# 6104235            Tags   Past Edits
LGD WAG-9HC with Banaras to Tirunelveli Bharat Gaurav Tourist Train arrived at Balaghat Junction
Translate to English
Translate to Hindi
Rail Fanning
11564 views
5

Jun 23 (20:33)   12556/Gorakhdham SF Express (PT) | NDLS/New Delhi (16 PFs) | PUNE/WAP-7/37079
SidharthRai
SidharthRai   324 blog posts
Entry# 6104196            Tags   Past Edits

6 pics

Travelled in Gorakhdham Express from Ndls to Gkp on 23rd April.Due to the cc of the train 3ac has good availability so got RAC 58 cleared.Was alloted seat in B10 which was 21 made(212485/NE) and had decent maintenance considering the turnaround at BTI.Staff in this train has always been helpful.While waiting for the loco at the front end of pf the crew from PRJY divn taking over from Ndls sat beside me.Had a good chat with them and watched IPL match with them.37079 Pune WAP 7 was the link and the loco is a great honker.Had a good run got delayed at Cnb due to pf issue. Later LKO trolled us as had a good run from Cnb to Manaknagar but waited at outer for 30 mins.Post Bbk track upgradation work by NER is clearly visible no slowdowns and very few restrictions.Fencing for 130 kmph is clearly visible at some...
more...
stretches .At some places Mumbai Ahmedabad strech like fencing with steel barriers is done for preventing CRO.Skipped the 128 yr old Elgin bridge at 110 kmph earlier there was slowdown due to change of channels on bridge now the work was completed so no restriction.

Translate to English
Translate to Hindi

General Travel
9201 views
2

Jun 23 (20:43)
SidharthRai
SidharthRai   324 blog posts
Re# 6104196-1              

8 pics

Third line work between Gonda kachari to Burhwal is also being done at good pace.Work between Maijapur to Gdk is little slow and Gdk to Gd also due to some encroaching structure near Gd.On all the stations of the strech pf work was ongoing for 3rd line.
Translate to English
Translate to Hindi

General Travel
9171 views
1

Jun 23 (20:50)
SidharthRai
SidharthRai   324 blog posts
Re# 6104196-2               Past Edits

3 pics

Additional signal installation was done on most strech from Mankapur to Gorakhpur with Maghar Jagatbela alredy equipped with ABS.Missed taking the picture of automatic signal with A marker in NER territory.Also some more loco pics at Gkp as we reached with 1 hr delay due to the pf being occupied by Gkp Humsafar.Up line in morning appears to be a freight corridor as crossed more than 15/20 freight train along with 4/5 pass trains from Gkp like intercity .
Translate to English
Translate to Hindi
Page#    176804 Blog Entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy