Search Forum
Filters:
Page# 63027 Blog Entries next>>
Apr 18 (21:49) 05043/Ramnagar - Aishbagh Special Fare Summer Special | LKU/Lal Kuan Junction (5 PFs)
harshit~
harshit~ 1017 blog posts2 more summer special weekly trains on Mailani-Pilibhit Section,
LJN-RMR special, LKU-BCY Express
First time pilibhit, Mailani will be connected to Varanasi
LJN-RMR special, LKU-BCY Express
First time pilibhit, Mailani will be connected to Varanasi
11 Posts
Hargaon mein Mera aana Jana rehta hai.. isiliye bola. Stoppage nahi bhi hoga toh koi baat nai.. rahi baat revenue ki toh wo train badhegi toh badhega. Thoda bahot timing bhi matter kerti hai..
Thoda passenger occupancy bhi nahi hai HA me as compare to GK, LMP..
MG ki kuch trains bhi nahi rukti thi.
Hopefully aane wale time me revenue badhega toh stoppage milenge
MG ki kuch trains bhi nahi rukti thi.
Hopefully aane wale time me revenue badhega toh stoppage milenge
MG k time pe sirf Nanital express aur Agra Fort nahi rukti thi..
Yesterday (13:12) 22643/Ernakulam - Patna SF Express (via Asansol) (PT)
SaiCharan^~
SaiCharan^~ 3355 blog postsToday (12:29) 12403/Prayagraj - Bikaner SF Express (Via Fatehpur Shekhawati) (PT) | LGH/Lalgarh Junction (3 PFs)
PrakharYadav^~
PrakharYadav^~ 12688 blog postsप्रयागराज-बीकानेर-प्रयागराज रेलसेवाओं का लालगढ़ तक विस्तार
जयपुर (विराट वैभव)। रेलवे द्वारा यात्रियों की सुविधा के लिए प्रयागराज-बीकानेर-प्रयागराज रेलसेवाओं का लालगढ तक विस्तार किया जा रहा है। उत्तर पश्चिम रेलवे के मुख्य जनसम्पर्क अधिकारी कैप्टन शशि किरण के अनुसार-
1....
more...
जयपुर (विराट वैभव)। रेलवे द्वारा यात्रियों की सुविधा के लिए प्रयागराज-बीकानेर-प्रयागराज रेलसेवाओं का लालगढ तक विस्तार किया जा रहा है। उत्तर पश्चिम रेलवे के मुख्य जनसम्पर्क अधिकारी कैप्टन शशि किरण के अनुसार-
1....
more...
1 Posts
After Cansaulim Majorda gets commissioned 37 kms (Cansaulim to Kalem) out of total 58 kms will be a double line on Vasco Kulem route.
Also Kalem to Kulem I think some forest clearances are pending that's why works not started except Kulem outers if it starts can be commissioned within 6 months as terrain is not too difficult and no houses near the tracks the entire track passes through forest.
Also Kalem to Kulem I think some forest clearances are pending that's why works not started except Kulem outers if it starts can be commissioned within 6 months as terrain is not too difficult and no houses near the tracks the entire track passes through forest.
1 Posts
Is There Plan To Extend This Vasco Majorda 2nd Line Upto Madgaon Jn And Then Change The Allignment Of This Line Towards Left Going To Kulem
I don't think so. They will use the existing tracks as double line from Majorda to Madgaon.
another thing is that the pf no 2 loop line ends at mao end at the existing down line which which is used as up line by both kr swr at that time many trains going towards rn block the existing down main line so suppose if a train coming from vsg comes at mjo outers and that train will halt at mjo outers for clearance cuz rn mao line is used as down main line by kr swr so how kr swr will solve this problem
Apr 19 (08:00) 22306/Jasidih - SMVT Bengaluru Weekly SF Express (PT) | JSME/Jasidih Junction (5 PFs)
22306_no_RSA
22306_no_RSA 37 blog posts1 Posts
Mere bhaiya ka ticket hain 2nd AC mein next week Jaipur wali ko cancel nahi kiya Asansol division toh 2 days late na khule 🫤
Page# 63027 Blog Entries next>>