Blog Entry# 1080812
Posted: May 02 2014 (13:48)

6 Responses
Last Response: May 03 2014 (00:42)
General Travel
2642 views
0

May 02 2014 (13:48)   MAQ/Mangaluru Central (Mangalore) (5 PFs)
 
Krishna Kumar
Krishna Kumar   206 blog posts
Entry# 1080812            Tags  
Is there any plan to double & electrify Konkan Railay in the near future? As doubling and electrification will end at Thokur, the whole Konkan Railway line from Thokur to Roha will be without these two features. As Panevel-Roha section and Shoranur-Thokur section is almost doubled, only Konkan line is not having doubled line. As the number of trains are increasing every year and the line is exceeding its capacity, doubling shall be initiated as soon as possible. During the construction of KR, it was designed to have double track, as the train services will be least affecting the existing line and ease of construction of second line.
Translate to English
Translate to Hindi

1 Posts

1183 views
0

May 02 2014 (15:00)guest
Re# 1080812-2              
soon we can see kerala bound trains from pnvl/via krcl under going loco change at maq/majn as maq/majn-srr section electrification will be completed
Translate to English
Translate to Hindi

829 views
0

May 02 2014 (15:08)
renjithbkrishnan~   1462 blog posts
Re# 1080812-3              
Remember reading something about proposal for 'patch doubling' on KR.
Translate to English
Translate to Hindi

588 views
0

May 02 2014 (20:49)
BarBossa^~
BarBossa^~   5072 blog posts
Re# 1080812-4              
@1080812-2  @guest
I dnt think soo
Translate to English
Translate to Hindi

845 views
0

May 02 2014 (20:59)
Yash^~   10901 blog posts
Re# 1080812-5              
Ya Konkan Railway had planned to double in Plains between Roha and Veer
Translate to English
Translate to Hindi

1030 views
0

May 03 2014 (00:42)
Krishna Kumar   206 blog posts
Re# 1080812-6               Past Edits
Exactly. If not today, tomorrow doubling is a must and having very high National Importance. As the traffic is increasing for an average of 20% per year over the Konkan Railway, there is no other option, but to lay another line with electrification. As the Konkan Railway was open to traffic in 1998 and within just 15 years, it has become one of the busiest routes in India. If only one line is considered, it handles more trains per year than Mumbai-Kota-Delhi route. And also, special thanks for the extreme hard works, patriotism, dedication towards their duties&responsibilities and initiatives taken by almost all the CMDs of KRCL, starting from Shri E. Sreedharan(the next Indian legend who deserves Bharat Ratna) to Shri BP Tayal for their future visions, including their superb team. Mangalore/Thokur-Udupi(42km), Roha-Veer(47km), etc were listed as the patch doubling sections, out of planned...
more...
patch doubling of 300km long plain lands on KRCL. KRCL is requesting all the 4 concerned states(Kerala, Karnakata, MH & Goa) for investing in all the listed sections to be doubled, as they are on plain lands or having the minimum tunnels, bridges and gradients. As KRCL handles around 80 trains per day and 3.6 crore passengers every year, any blind person can say the existing single line is not at all sufficient to handle ever increasing traffic. Goods traffic is heavier than almost any other sections in India and almost all the express trains on KRCL are having long waiting list, almost all the 365 days/year. If we try to book a ticket on KRCL today for today's or tomorrow's journey for a long distance, 99% sure - we cannot get the ticket. But, on other sections, it is normal to get today's ticket, depending on the season. As the electrification will save approximately Rs. 100 crores for KRCL every year as compared with fuel cost, around Rs. 600 crores are expected to electrify the whole 741km long single line. KRCL had plans to implement the electrification on BOT basis, around 3-4 years back itself. A whopping Rs. 15000 crores are required for the doubling works, for which KRCL has approached Japanese funding agency(JICA) and World Bank, in addition to the respective state governments. It is interesting to know that the total construction cost of Konkan Railway was Rs. 3500 crores. Actually, all these 4 states should jointly pressurize the next Central Government to get these two high priority plans done with 50:50 cost sharing on war-footing, as it is highly expensive construction on such an extremely anti-railway landsliding terrain. If the works start now, it will take a minimum of 10 years to finish, as the terrain is so harsh and anti-railway, even on these planned 300km long patch doubling sections. By that time, the requirement may be to double the whole KRCL route, irrespective of the cost, as the high returns as sure, but more years...

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy