Krishna Kumar 206 blog postsIs there any plan to double & electrify Konkan Railay in the near future? As doubling and electrification will end at Thokur, the whole Konkan Railway line from Thokur to Roha will be without these two features. As Panevel-Roha section and Shoranur-Thokur section is almost doubled, only Konkan line is not having doubled line. As the number of trains are increasing every year and the line is exceeding its capacity, doubling shall be initiated as soon as possible. During the construction of KR, it was designed to have double track, as the train services will be least affecting the existing line and ease of construction of second line.