Search Forum
Blog Entry# 1080859
Posted: May 02 2014 (14:08)
5 Responses
Last Response: Jun 27 2014 (21:42)
5 Responses
Last Response: Jun 27 2014 (21:42)
Sainthiya yard pending....WAG's are running upto Bakreshwar Thermal Plant,Chinpai
UDL-SNT is 95% electrified and energized as well. Remaining works are Kunuri to Sainthia portion alongwith the freight loading/unloading point at Sainthia. Very soon, the road bridge could be raised higher to make way for elocos.