Search Forum
Blog Entry# 1254534
Posted: Oct 23 2014 (13:50)
9 Responses
Last Response: Oct 24 2014 (07:34)
9 Responses
Last Response: Oct 24 2014 (07:34)
New Facilities/Technology
CR/Central
SRG^~ 779 news posts
CR plans to extend CST platforms, replace old FOBs at six stations
Manthank...
Manthank...
4 Posts
Very long pending demand finally comes to an end.
Good move to replace foot over bridge at Mumbra. Really it is very congested
Good move to replace foot over bridge at Mumbra. Really it is very congested
CSTM is already congested sir. Many trains would have shifted to LTT if was well connected to Local trains.
I think it's good to run it from Dadar itself
I think it's good to run it from Dadar itself
There are many trains that require augmentation, but are awaiting the same due to platform length constraint at CST... One such train is CSTM-HYB Hussain Sagar Exp, for which I have received a reply from SCR stating the platform length constraint at CST... An excellent move by CR for allocating funds for extending platforms at CST...
7 nos of sectional coaches of PUNE >-< CHENNAI EGMORE should be attached to this highly patronage MUMBAI CST - CHENNAI EGMORE SF.Since no trains are operated between PUNE MINI METRO and CHENNAI METRO.