Search Forum
Blog Entry# 1331054
Posted: Jan 05 2015 (13:15)
1 Responses
Last Response: Jan 05 2015 (13:15)
1 Responses
Last Response: Jan 05 2015 (13:15)
Commentary/Human Interest
ML/Mumbai Local
Rang De Basanti^ 138872 news posts
Forget bullet trains, focus on the basic stuff. After last week’s chaos on Mumbai’s suburban railway network, often called the city’s lifeline, the message from Mumbaikars...
read more... Forget bullet trains, focus on the basic stuff
The first major task is shifting Central Railway’s electrical system from direct current (DC) to alternating current (AC) between Thane and CST. It is the only stretch on Indian Railways where trains operate on the antiquated DC system. The conversion project has got delayed by almost three years. Last month, Central Railway completed the project and carried out tests; now, the railway safety commissioner must now give his clearance before Central Railway can roll out the system. Prabhu, handpicked by Prime Minister Narendra Modi, can help cut the red tape and move Central Railway to AC system at the earliest. The conversion has two distinct advantages. First, it will reduce incidents of pantographs getting stuck in the overhead wires. The current pantographs are designed to draw power from both AC and DC systems, but such design leads to pantographs getting stuck while switching from one system to another. Second, Central Railway...
more...
more...