Search Forum
Blog Entry# 1436707
Posted: Apr 21 2015 (11:04)
4 Responses
Last Response: May 13 2015 (10:32)
4 Responses
Last Response: May 13 2015 (10:32)
Doubling of KR
there are news KR will go for Electrification. But I think before electrification, they should plan for doubling which will really benefit the route. Is in't it possible to double this line, selecting the stretches with no Tunnels first and reduce the congestion?
there are news KR will go for Electrification. But I think before electrification, they should plan for doubling which will really benefit the route. Is in't it possible to double this line, selecting the stretches with no Tunnels first and reduce the congestion?
Patch doubling was proposed along with full electrification. But we haven't heard anything on this in the last several weeks.
1 Public Posts - Tue Apr 21, 2015
1 Public Posts - Tue May 05, 2015
1 Public Posts - Wed May 13, 2015