Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Pamban Sethu - இது தான் நம்முடைய ராமர் சேது - Darnish C

Search Forum
<<prev entry    next entry>>
Blog Entry# 1493994
Posted: May 31 2015 (18:26)

5 Responses
Last Response: Jun 13 2015 (12:58)
General Travel
7624 views
4

May 31 2015 (18:26)   22473/Bikaner - Bandra Terminus SF Express
 
guest
Entry# 1493994            Tags   Past Edits
followup from /blog/post/1418914
after my continous grievances to NWR/ WR , recently some augmentations are done ... nowadays CC are
22931 / 22932 JSM - BDTS = 17 coach
22915 / 22916 Hisar BDTS = 17 coach
12489/
...
more...
12490 Bikaner - Dadar = previously 20 coach , now 21 coach
19065 / 19066 Bandra Jodhpur = 21 coach
22473/22474 Bikaner SF = previously 21 coach , now 22 coach

Translate to English
Translate to Hindi

4527 views
1

May 31 2015 (18:32)
Mridul^~
Mridul^~   46846 blog posts
Re# 1493994-1              
@1493994-0  @guest
Congratulations.............................
Translate to English
Translate to Hindi

4552 views
0

Jun 01 2015 (14:56)
Ritzraj~
Ritzraj~   1486 blog posts
Re# 1493994-2              
@1493994-0  @guest
read in news paper that new time table is being postponed to 1st oct 2015 since there will be an overhaul.
any news/list of nwr trains getting speed up.
Translate to English
Translate to Hindi

4698 views
1

Jun 01 2015 (15:00)guest
Re# 1493994-3              
But I don't think We need any speed up. Already NWR trains maintain good speed in NWR. We need more permanent augmentations of AC coaches. Because I have seen AC tickets remain waiting of many passengers
And we need new trains. Like
Barmer Howrah
Jodhpur Mumbai AC
Jodhpur
...
more...
Hyderabad triweekly SF via Pune

Translate to English
Translate to Hindi

4608 views
0

Jun 02 2015 (15:46)
Ritzraj~
Ritzraj~   1486 blog posts
Re# 1493994-4              
@1493994-3  @guest
new trains and augmentation are being regularly taken up at different forums by many people but nobody speak of speeding up of trains. Most of the trains are maintaining same TT even though there has being a sea change in technology leading to electrification and doubling on many sections.
what i am trying to stress is that if the a national level exercise is being done to increase the capacity by speeding up the trains, then we should not lag behing. we should also ask for speeding up of trains wherever possible at an overall level not necessarily in NWR region. eg. TT of 19065/66 can be easily tweaked to reduce the travel time by 1 hr. i have always seen it
...
more...
waiting for at least 1 hr. for other trains to cross or being overtaken between ST and ABR sections.
TT will not be improved till we raise a voice.

Translate to English
Translate to Hindi

6542 views
0

Jun 13 2015 (12:58)guest
Re# 1493994-5              
at present NWR dont have infrastructure to speed up trains..
very few trains have high speed lhb coch..
we have single lines mostly
high speed pasenger emd are very few.. just 51 at present..
signalling
...
more...
also need to be improved..
hence speed up is not possible presently..

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy