Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Antyodaya Express: The best a common man can get. - Vikas Kumar

Search Forum
<<prev entry    next entry>>
Blog Entry# 1577648
Posted: Aug 30 2015 (08:16)

4 Responses
Last Response: Aug 31 2015 (09:01)
Rail News
6809 views
2

Commentary/Human Interest
INT/International
Aug 30 2015 (05:54)   High-tech in a railway tunnel
 

Rang De Basanti^   138872 news posts
Entry# 1577648   News Entry# 239366         Tags   Past Edits
The Gotthard base tunnel, the longest in the world at 57 kilometres, will open in one year. The test phase for the railway, fitted with high-tech...

4649 views
1

Aug 30 2015 (08:16)
S_V_Iyer^~
S_V_Iyer^~   18234 blog posts
Re# 1577648-1              
#Record Longest Rail Tunnel in the world: 57 kms...

At Flat 250 kmph speed, trains will still require a little more than 12 minutes to cross the tunnel :)
Translate to English
Translate to Hindi

3894 views
0

Aug 30 2015 (21:02)
MSRINIVASANME~   4761 blog posts
Re# 1577648-2              
IR should be also acquainted this TUNNEL TECHNOLOGY and utilized in the Western Ghats in Karnataka ,new line Hubbali-Ankola etc and other Himalaya Range/Vindhya Range New Railway Line sections.
Translate to English
Translate to Hindi

3859 views
1

Aug 30 2015 (22:36)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 1577648-3              
Technology is not a real problem here. The problem is the cost involved. With such projects, there is no scope of cost saving as every single aspect of the tunnel must be constructed very precisely. Even the tiniest mistake will risk hundreds of lives. The Swiss project in the post cost an estimated 66000 crore Rupees for the 57 km tunnel. Given the treacherous conditions in the western ghats, the cost will be even more. We simply don't have enough money to take up such projects. Also, with the kind of fare structure followed in India, it'll take several decades for the railways to recover this investment.
Another problem is the use of non A/C sleeper coaches.
...
more...
Beyond a certain length and depth of the tunnel, it is not safe to use non A/C coaches as the air quality will degrade substantially. It'll be a huge economic burden on the railways and the people as they will not have any low cost travel means.

Translate to English
Translate to Hindi

3958 views
0

Aug 31 2015 (09:01)
12YEARSINIRI^~   11515 blog posts
Re# 1577648-4              
Regarding the tunnels , Do u think its possible to run a train without airconditioning inside that ? if we run then ppl ll suffer asphyxiation due to lack of oxygen. Just for the 5km tunnel near Karwar , i have heard many people saying they have pain in ears due to the pressure difference. For 50-60 Kms we need long tunnel we need to run only AC trains with AC cabs for drivers. By the way train in switzerland run in hills but here it climbs from a coastal plain to plateau , there is a difference between the both . Climbing a plateau within a short distance is not an easy task. There trains run at 250 Kmph , here it will 45kmph for the trains which ascends and 30kmph for the trains which descends, so it needs more than 1.5 hours.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy