Search Forum
Blog Entry# 1732034
Posted: Feb 07 2016 (09:56)
16 Responses
Last Response: Feb 08 2016 (16:05)
16 Responses
Last Response: Feb 08 2016 (16:05)
Commentary/Human Interest
Rang De Basanti^ 138872 news posts
Rajahmundry MP M. Murali Mohan— PHOTO: S. RAMBABU
Member...
Member...
read more... Double-decker train from Vizag to Vijayawada sought
12 Posts
Agree with Varanasi connectivity. But the route is longer. And vskp wouldn't start it via BZA. Tpty Varanasi via BZA vskp would be perfect. And I donno why ds mp is again after rajdhani connectivity. And yes though not a DD/shatabdi, an ice is required in frst place with additional to ratnachal and janmabhumi. Bdw wat happened to that shatabdi exp which came to light 4-5 months ago through aviation minsiter. Idigo vastundi ani Statment kuda ichesar ga.
Road cum rail bridge lo 2 lines unaay antunadu enti ? Single track e ga undi.
Is he talking about 4/5 platforms..? nothing much has been done to call them a full fledged platforms.