Search Forum
Blog Entry# 1938182
Posted: Jul 22 2016 (22:04)
5 Responses
Last Response: Jul 25 2016 (13:09)
5 Responses
Last Response: Jul 25 2016 (13:09)
I am pretty sure , none of the halts for MMTS are of 1 min except for at big stations like SC , KCG , HYB , LPI , FM ...i have never seen it stop for 1 min ..it comes and probably in 30 seconds goes away ...but certainly not 1min ..is it because 1min is less time or is it really less than 1 min ..!!
48 kms engine rooling on MMTS phase 2 will be done by March 2017
Ayya, let's hope for the best.
MMTS phase-2 without atleast tripling of SNF-LPI would be waste. This is what I feel personally. Because, ippatike aa line over saturated and trains in peak hours chala kastanga tipputunnaru. Again Phase-2 ante, chala kastam with all those movements.
MMTS phase-2 without atleast tripling of SNF-LPI would be waste. This is what I feel personally. Because, ippatike aa line over saturated and trains in peak hours chala kastanga tipputunnaru. Again Phase-2 ante, chala kastam with all those movements.
i doubt any 'local train' stops at a halt for 1 minute, which is why IR timetables only mention departure time, not arrival.