Jul 25 2016 (16:30) 12052/Madgaon - Mumbai CSMT Jan Shatabdi Express
Suresh Reddy~
Suresh Reddy~ 7389 blog posts3 Posts
Sir, it's not about private zone or something. The inflated amount is collected even in MUE-ADB, MAQ-SKLR-HAS etc
Previously, there used to be inflated rate in KCG-SBC route. Now it's withdrawn.
The extra amount collected would go for the construction company, just like tolls on national highway
## The actual distance between MUE and ADB is 161km, whereas it's 243km shown in the IR...
more...
Previously, there used to be inflated rate in KCG-SBC route. Now it's withdrawn.
The extra amount collected would go for the construction company, just like tolls on national highway
## The actual distance between MUE and ADB is 161km, whereas it's 243km shown in the IR...
more...
Construction cost recover chesukovadaniki ekkuva fare charge chestaru. Instead of creating a separate fare structure just for Konkan ( charge per km or the distance slabs in calculating ticket costs), they use the same fare structure as the rest of the country, while inflating the distance.
It's about private zone. KR has spent huge amount of money in building the network at short notice. There are huge amounts of loaned money to be paid back and hence the KMs are inflated.
Thanks bhai naku konkan ila separate distance tho seperate fare ani ipudeey telsindi..thanks all
Okay, agreed that it's a private zone. But the same inflated amount is collected even in IR too. It's not about KR only. I have given few examples already.