Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Chetak Express: - यार तेरा चेतक पे चले ❤️ - Keshav Saxena

Search Forum
<<prev entry    next entry>>
Blog Entry# 1949983
Posted: Aug 03 2016 (00:19)

9 Responses
Last Response: Aug 06 2016 (01:33)
Rail News
5062 views
2

Other News
CR/Central
Aug 02 2016 (21:04)   TALGO TRAIL RUN.
 

TAGEERUANUBHARADWAJ^   204 news posts
Entry# 1949983   News Entry# 275741         Tags   Past Edits
Report for the first leg of time validation trials of Spanish Talgo Train from New Delhi to Mumbai Central
•...
read more... TALGO TRAIL RUN.

4 Public Posts - Wed Aug 03, 2016

2509 views
0

Aug 04 2016 (08:00)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 1949983-5              
In this respect, it can be said that all the train rakes running on the are I Rlys tracks including the premier ones like Rajdhani/ Shatabdi/ Duronto etc are under utilised !! The culprit here is the slack time given to the trains so as to accommodate large number of passenger/freight trains jostling for "green Signal" to move along in the limited Indian railway Network, and to facilitate the regular track maintenance activities.
If all trains get green signal through out their run about 20-35% of the running times can be saved for most of the express trains on IRly network.
Mumbai
...
more...
Rajdhani enjoy topmost priority (minimum slack time, interesting to compare with NZM-TVC Raj) where as the Talgo train, I guess should have got through green signal for NDLS-BCY journey (w/o any provision of slack time)
Talgo was expected to do NDLS-BCTin 13 hrs against 16 hrs of Raj i.e. a gain of 3 hours For same priority, technically only time Talgo train can save is faster acceleration/ deceleration at stops and speed restrictions due to very small train load (about half hour?) and higher speed maintained on curves (say another half - to one hour). Rest of the time it was supposed to gain i.e. 1.5-2 hrs should be due to difference in slack time.
One burning example in this respect is, HWH-CSTM Duronto, which had same operational speed (105/110kmph) as other super-fast trains like Gnaneshwari/ Geetanjali but much higher avg. speed of 75kmph against just 55-60 kmph for the other S/F trains on the route. On the inaugural run (yr 2009) the Duronto (the pet train of RM) was given through green signal and the avg. running speed between 2 stops (excluding stoppage time) was around 90-95 kmph, where as the same for other S/F trains was 60-80 kmph, indicating how the slack time given to trains drastically increase the journey times.

Translate to English
Translate to Hindi

2 Public Posts - Fri Aug 05, 2016

2 Public Posts - Sat Aug 06, 2016
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy