Search Forum
Blog Entry# 1954041
Posted: Aug 06 2016 (23:29)
9 Responses
Last Response: Aug 08 2016 (01:04)
9 Responses
Last Response: Aug 08 2016 (01:04)
Other News
NER/North Eastern
Saurabh 3589 news posts
-मार्च तक पूरा हो जायेगा 120 किलोमीटर रूट का विद्युतीकरण, अप्रैल में होगा ट्रायल
-अप्रैल...
-अप्रैल...
read more... माधोसिंह स्टेशन तक दौड़ेगी इलेक्ट्रिक ट्रेन
1 Public Posts - Sat Aug 06, 2016
3 Public Posts - Sun Aug 07, 2016
2 Public Posts - Mon Aug 08, 2016
M not sure whether it is operational or not but had spotted goods train sometime.
As per my discussion with one of the official of NER BSB, he said currently focus is on doubling b/w Aurihar and BSB; electrification b/w BSB and ALY. Also 4th washing line is under construction at MUV and as well there is construction of washing line at MAU which might get operational by DEC
As per my discussion with one of the official of NER BSB, he said currently focus is on doubling b/w Aurihar and BSB; electrification b/w BSB and ALY. Also 4th washing line is under construction at MUV and as well there is construction of washing line at MAU which might get operational by DEC
2 Public Posts - Mon Aug 08, 2016