Search Forum
Blog Entry# 1954076
Posted: Aug 07 2016 (00:53)
22 Responses
Last Response: Aug 07 2016 (14:59)
22 Responses
Last Response: Aug 07 2016 (14:59)
Aug 07 2016 (00:53) 12424/New Delhi - Dibrugarh Rajdhani Express | ALD/Allahabad (10 PFs)
Monk_in_Black~
Monk_in_Black~ 4903 blog posts17 Posts
Indeed, there were some electrical issues with the P7 hauling it which led to detainment of train at ALD
(New Delhi-Dibrugarh/Rajdhani/Load-21 Coaches) Detained at Allahabad for unscheduled loco changed due to working loco failed. After passing Sath Naraini (SNIE) station VCB tripped with message on DDS "Dis. in con-1 and Traction bogie-1 isolated itself". On arrival put MCE off/on got succeed but after starting again stopped due to speed not increased more than 2 kmph with message "Error in techo genrator-2". Train back to under starter. Fresh loco given. IC-17.05.16, TI/NDLS-06.08.16, Major-Allahabad (ALD) station, Time-21.30-23.37=127-3=124' extra. Loco at ALD Yd.
(New Delhi-Dibrugarh/Rajdhani/Load-21 Coaches) Detained at Allahabad for unscheduled loco changed due to working loco failed. After passing Sath Naraini (SNIE) station VCB tripped with message on DDS "Dis. in con-1 and Traction bogie-1 isolated itself". On arrival put MCE off/on got succeed but after starting again stopped due to speed not increased more than 2 kmph with message "Error in techo genrator-2". Train back to under starter. Fresh loco given. IC-17.05.16, TI/NDLS-06.08.16, Major-Allahabad (ALD) station, Time-21.30-23.37=127-3=124' extra. Loco at ALD Yd.
Then what happened to 22824 and 12310? They also had some unscheduled halts and delays.
Looks like some problem with 22824 BBS Rajdhani..It was Overtaken by 12570 Garib Rath,12310 Patna Rajdhani and 12394 Kranti..
12394 ne bhi lapet diya..Lagta hai vvip 12570 se MGS utar gaya..:-P