What is happening on Central Railway Mumbai right now is one of the biggest planning failures of Mumbai. If, after running the highest number of train...
3 Public Posts - Sat Aug 13, 2016
problem is lack of spending in infrastructure like dedicated lines for locals. if land is not available make provision for elevated corridor. if that is not feasible, then construct metros over major roads. There are lot of solutions but this is possible only if there is a political backing which is not there for the far flung areas like diva, badlapur, vasai-virar etc.
2 Public Posts - Wed Aug 17, 2016