Full Site Search  
Tue Jan 23, 2018 13:35:07 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 1976995
Posted: Aug 31 2016 (11:54)

3 Responses
Last Response: Aug 31 2016 (12:10)
  
General Travel
0 Followers
628 views
Aug 31 2016 (11:54)  
 

srinivasvasanthi~   4275 blog posts   15 correct pred (54% accurate)
Entry# 1976995            Tags   Past Edits
Vijayawada Jn also operated with more congestion.Anew line TENALI to Gudivada with electrification have to be constructed to relieve congestion of Vijayawada jn.

  
405 views
Aug 31 2016 (12:00)
Guest: 744cc923   show all posts
Re# 1976995-1            Tags   Past Edits
No use

  
433 views
Aug 31 2016 (12:02)
Surat 3rd Fastest Growing City Of World*^~   33271 blog posts   70447 correct pred (81% accurate)
Re# 1976995-2            Tags   Past Edits
Post only once not more then 1 time it's called spam here

  
Aug 31 2016 (12:10)
HOG WAM4 WAP1~   3230 blog posts
Re# 1976995-3            Tags   Past Edits
The congestion problem is more in BZA-VSKP sector than BZA-MAS and north-bound traffic at BZA is managed well due to PF arrangements. And BZA-GDR 3rd line has been commissioned, which can further improve things.
Your proposal is also useful, once the proposed port corridor in AP is sanctioned. A connection between MTM-BPT bypassing BZA is part of the plan.
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.