Oct 16 2016 (17:41) 12851/Bilaspur - MGR Chennai Central Weekly SF Express (PT)
Desiincanada~
Desiincanada~ 1274 blog postsElectrification status of gondia ballarshah section
Pic taken at nagbhir,see the erected electric poles and lots of cement slabs for doubling.
Noticed that the poles are erected with wiring throughout the route
Pic taken at nagbhir,see the erected electric poles and lots of cement slabs for doubling.
Noticed that the poles are erected with wiring throughout the route
1 Public Posts - Mon Oct 17, 2016
plz post more pics of G-BPQ ongoing electrification work if possible
1 Public Posts - Tue Oct 18, 2016
1 Public Posts - Sun Oct 30, 2016