Search Forum
Blog Entry# 2077751
Posted: Dec 02 2016 (08:52)
10 Responses
Last Response: Dec 06 2016 (10:39)
10 Responses
Last Response: Dec 06 2016 (10:39)
New Facilities/Technology
SWR/South Western
karbang~ 1742 news posts
BENGALURU: Out of the 28 MLAs and six MPs in Karnataka, about 16 have supported the Citizens for Bengaluru (CFB) in their campaign to #ChukuBukuBeku to...
read more... Citizens movement presses for suburban rail
6 Posts
Few more line alignment changes is also needed .
Like linking HSRA line with CDSR
Like linking HSRA line with CDSR
Yes. But line from Hosur after Kaggadasapura railway gate comes at a higher level and then it passes on a RoB over old Madras road, parallel to the Tin factory- ring road flyover. Now if it needs to be connected to CDSR then there needs to be a right side ramp to gradually descend and join the KJM-YNK line. It already has a left ramp that joins KJM-BNC line. The right ramp is not possible now with Tin factory junction being a mess and the already existing Tin factory - Hebbal flyover.
-
However...
more...
-
However...
more...
A branch line from Heelalige to Electronic city -- 6 to 8 kms parallel to the highway on elevated levels is possible. Along with this, a 2 km link between Hebbal-YPR line will do wonders.