No this station is not in current mmts phase 2.bcoz scr thinks construction of rob rub is impossible(high cost and ptcr station lies away from town so it is not economically feasible) on mumbai highway.but at that location if they construct rob it will benifit locals crossing highway and trains can be extended upto ptcr.at present track laying was completed in many parts upto rc puram.but i didnt see any station building or platform.acccording to scr gm lingampally rcpuram emu trains will be started in december this year
no...i think it's very difficult to lay the line again upto patancheru...as there is pune hwy with heavy traffic and needs fly over construction if patancheru stn gets operated...so the line will be upto ramachandrapuram if am correct
This station will be opened if adilabad pathancheru line was laid but govt has changed adilabad line it is from adilabad armoor.at present akkanapet medak line is in construction.and medak siddipet survey is done may be next year sanction.if kcr becomes cm next time or dfc are laid in south india then patancheru sangareddy sidipet bidar new line would be laid .at least not in decade