Blog Entry# 2229469
Posted: Apr 10 2017 (12:56)

3 Responses
Last Response: Apr 10 2017 (15:53)
General Travel
48645 views
0

Apr 10 2017 (12:56)   PTCR/Patancheru
rahulkumarjain^~
rahulkumarjain^~   16482 blog posts
Entry# 2229469            Tags  
does this station started operating
Translate to English
Translate to Hindi

22420 views
1

Apr 10 2017 (13:10)
Sheikkaleemmaulali~
Sheikkaleemmaulali~   806 blog posts
Re# 2229469-1              
No this station is not in current mmts phase 2.bcoz scr thinks construction of rob rub is impossible(high cost and ptcr station lies away from town so it is not economically feasible) on mumbai highway.but at that location if they construct rob it will benifit locals crossing highway and trains can be extended upto ptcr.at present track laying was completed in many parts upto rc puram.but i didnt see any station building or platform.acccording to scr gm lingampally rcpuram emu trains will be started in december this year
Translate to English
Translate to Hindi

23118 views
1

Apr 10 2017 (13:12)
Skaranams_KRNT~
Skaranams_KRNT~   5987 blog posts
Re# 2229469-2               Past Edits
no...i think it's very difficult to lay the line again upto patancheru...as there is pune hwy with heavy traffic and needs fly over construction if patancheru stn gets operated...so the line will be upto ramachandrapuram if am correct
Translate to English
Translate to Hindi

28465 views
1

Apr 10 2017 (15:53)
Sheikkaleemmaulali~
Sheikkaleemmaulali~   806 blog posts
Re# 2229469-3              
This station will be opened if adilabad pathancheru line was laid but govt has changed adilabad line it is from adilabad armoor.at present akkanapet medak line is in construction.and medak siddipet survey is done may be next year sanction.if kcr becomes cm next time or dfc are laid in south india then patancheru sangareddy sidipet bidar new line would be laid .at least not in decade
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy