Search Forum
Blog Entry# 2261081
Posted: May 03 2017 (15:33)
2 Responses
Last Response: May 03 2017 (15:47)
2 Responses
Last Response: May 03 2017 (15:47)
Commentary/Human Interest
SCR/South Central
Rang De Basanti^ 138872 news posts
The SCR General Manager Vinod Kumar Yadav, in an interaction with top officials of the Zone, stressed on the need for ensuring that the quality of...
read more... ‘Maintain work quality’
* SCR GM hits the right button!!
* Practically, under tremendous enthusiasm/pressure to achieve the completion targets, the officials neglect the quality aspect.
* Shortcuts are often adopted through bypassing of stipulated testing, curing etc which result in suboptimal performance of the new asset/ track/ bridge/ rake etc.
* Practically, under tremendous enthusiasm/pressure to achieve the completion targets, the officials neglect the quality aspect.
* Shortcuts are often adopted through bypassing of stipulated testing, curing etc which result in suboptimal performance of the new asset/ track/ bridge/ rake etc.
Need of third line between SLO-RLY also. Also 3 rd line over Godavari.
RJY becoming bottleneck these days due to less infra. Needs atleast 2 PF at RJY or Another satellite station.
RJY becoming bottleneck these days due to less infra. Needs atleast 2 PF at RJY or Another satellite station.