Search Forum
Blog Entry# 2261352
Posted: May 03 2017 (19:30)
6 Responses
Last Response: May 03 2017 (20:05)
6 Responses
Last Response: May 03 2017 (20:05)
New Facilities/Technology
Anupam Enosh Sarkar^~ 27783 news posts
Indian Railways has gone for a ‘major makeover’ of the AC 3-tier coach
Soon,...
Soon,...
1 Posts
Is this the way they hope to reduce 2A and get more 3A coaches
steel mug chained to a pipe has been replaced by a faucet. ....... that is the real re-design .....
With LHB trains, the little space for physically challenged people is gone too.