Search Forum
Blog Entry# 2261693
Posted: May 04 2017 (01:41)
12 Responses
Last Response: May 08 2017 (17:31)
12 Responses
Last Response: May 08 2017 (17:31)
May 04 2017 (00:26) सूरत से मुंबई का सफर होगा डेढ़ घंटे कम, लाइनों का अपग्रेडेशन जल्द
Manoj Sinha on IRI~ 62 news posts
सूरत/मुंबई. सूरत से मुंबई का सफर जल्द और तेज होगा और इसें डेढ़ घंटे बचेंगे। यानी अभी जहां साढ़े चार घंटे लगते हैं, वह तीन घंटे...
1 Public Posts - Thu May 04, 2017
8 Public Posts - Fri May 05, 2017
1 Public Posts - Sun May 07, 2017
Improvement in track layout/geometry is a costly proposition and should be carried out if there are sufficient number of trains/rakes which can be operated at 130kmph speeds.
-
Till date trains with non ac coaches are limited to 110kmph speed, and 130 kmph non ac LHB trains are just a few in number. (Surprisingly their avg speeds have not improved significantly after speed increase from 110-130kmph, and their avg. speeds are too less than Raj speeds on the routes). Probably IR is testing their performance, before makig it a policy decision.
-...
more...
-
Till date trains with non ac coaches are limited to 110kmph speed, and 130 kmph non ac LHB trains are just a few in number. (Surprisingly their avg speeds have not improved significantly after speed increase from 110-130kmph, and their avg. speeds are too less than Raj speeds on the routes). Probably IR is testing their performance, before makig it a policy decision.
-...
more...
1 Public Posts - Mon May 08, 2017