Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Forget AI; our RailFans are endowed with NI - Natural Intelligence

Search Forum
<<prev entry    next entry>>
Blog Entry# 2261693
Posted: May 04 2017 (01:41)

12 Responses
Last Response: May 08 2017 (17:31)
Rail News
7923 views
2

May 04 2017 (00:26)   सूरत से मुंबई का सफर होगा डेढ़ घंटे कम, लाइनों का अपग्रेडेशन जल्द

Manoj Sinha on IRI~   62 news posts
Entry# 2261693   News Entry# 301514         Tags   Past Edits
सूरत/मुंबई. सूरत से मुंबई का सफर जल्द और तेज होगा और इसें डेढ़ घंटे बचेंगे। यानी अभी जहां साढ़े चार घंटे लगते हैं, वह तीन घंटे...

1 Public Posts - Thu May 04, 2017

8 Public Posts - Fri May 05, 2017

1 Public Posts - Sun May 07, 2017

2855 views
1

May 08 2017 (13:45)
A2Z~
A2Z~   17505 blog posts
Re# 2261693-11              
Improvement in track layout/geometry is a costly proposition and should be carried out if there are sufficient number of trains/rakes which can be operated at 130kmph speeds.
-
Till date trains with non ac coaches are limited to 110kmph speed, and 130 kmph non ac LHB trains are just a few in number. (Surprisingly their avg speeds have not improved significantly after speed increase from 110-130kmph, and their avg. speeds are too less than Raj speeds on the routes). Probably IR is testing their performance, before makig it a policy decision.
-
...
more...

Scope for large scale upgradation of IR tracks to 130kmph shall take place once IR make it a policy to operate all non ac LHB trains at 130kmph.
-
Track geometry which put speed restriction on trains is gift of British era. Since most of the tracks were laid pre independence era when much lower operating speeds were prevalent, the track geometry was not planned for higher speeds. Not much/enough has been done in 70 years of independence to improve the track geometry & train speeds in IR. Many Gauge converted routes with good pax. traffic potential like SBC-MAC, SBC-CBE etc are badly suffering due to poor track geometry.
-
IR was busy with continuous struggle to raise funds (with minimal raise in pax fares) for absolutely essential capacity augmentation needed to carry the traffic offerings and funds for improving track geometry for increasing speed could not get due attention.

Translate to English
Translate to Hindi

1 Public Posts - Mon May 08, 2017
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy