Search Forum
Blog Entry# 2273907
Posted: May 12 2017 (14:17)
7 Responses
Last Response: May 12 2017 (18:14)
7 Responses
Last Response: May 12 2017 (18:14)
May 12 2017 (14:17) 12560/Shiv Ganga Express | GKP/Gorakhpur Junction (10 PFs)
roh4iitt
roh4iitt 32 blog postsI just want to share a travel experience that I had last week. I was traveling from NDLS-BSB with 12560/Shiv Ganga Express and BSB-UMB with 12237/Begampura Express. The interesting fact that both the train were running before time throughout the entire journey. I reached MUV 15 min early with 12560/Shiv Ganga Express and reach UMB 10 min early with 12237/Begampura Express.
One interesting fact we should know that ALD-MUV is a single line track without electrification and BSB-LKO not complete double line. Still both the trains able to maintain good speed and punctuality.
Why...
more...
One interesting fact we should know that ALD-MUV is a single line track without electrification and BSB-LKO not complete double line. Still both the trains able to maintain good speed and punctuality.
Why...
more...
2 Public Posts - Fri May 12, 2017
Bro work chlrha hai pure LKO-GKP section mein..this section will get speeded up in hthe coming months time to 120 MPS...toh TSR lga Rhta hai mostly at different places..wait from some time bs..😊😀
4 Public Posts - Fri May 12, 2017