Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हमसे सीखे कोई जीने का सलीका। सफर कैसा भी हो, मौज़ उडाये जाते हैं।। - Amir

Search Forum
<<prev entry    next entry>>
Blog Entry# 2380515
Posted: Aug 14 2017 (23:22)

2 Responses
Last Response: Aug 15 2017 (16:09)
General Travel
4234 views
4

Aug 14 2017 (23:22)   DEE/Delhi Sarai Rohilla (5 PFs)
Jesh_.
Jesh_.   582 blog posts
Entry# 2380515            Tags   Past Edits
Details of Delhi Sarai Rohilla to Rewari electrification
Translate to English
Translate to Hindi

2208 views
0

Aug 15 2017 (12:47)
BRCWAP7~
BRCWAP7~   13281 blog posts
Re# 2380515-1              
sp ssp tss... please explain me
Translate to English
Translate to Hindi

3114 views
1

Aug 15 2017 (16:09)
Jesh_.
Jesh_.   582 blog posts
Re# 2380515-2              
#ELECTRIFICATION DETAILS:------>
Sectioning and Paralleling Post (SP)
These posts are situated approximately midway between feeding posts marking the demarcating point of two zones fed from different phases from adjacent sub-stations. At these posts, a neutral section is provided to make it impossible for the pantograph of an electric locomotive or EMU train to bridge the different phases of 25 kV supply, while passing from the zone fed from one sub-station to the next one. Since the neutral section remains 'dead', warning boards are provided in advance to warn and remind the Driver
...
more...
of an approaching electric locomotive/EMU to open locomotive circuit breaker (DJ) before approaching the 'neutral section', to coast through it and then switch 'on' on the other side. Special care is taken in fixing the location of neutral sections, on level tangent tracks far away from signals, level crossing gates etc. to ensure that the train coasts through the neutral section at a sufficiently high speed, to obviate the possibility of its stopping and getting stuck within the neutral section.
A paralleling interruptor is provided at each 'SP' to parallel the OHE of the up and down tracks of a double track section, 'bridging interrupters' are also provided to permit one feeding post to feed beyond the sectioning post upto the next FP if its 25 kV supply is interrupted for some reasons. These bridging interruptors are normally kept open and should only be closed after taking special precautions as detailed in these rules.
Sub-Sectioning and Paralleling Post (SSP)
One or more SSPs are provided between each FP and adjacent SP depending upon the distance between them. In a double track section, normally three interruptors are provided at each SSP i.e. two connecting the adjacent sub-sectors of up and down tracks and one for paralleling the up and down tracks.
Source:
click here

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy