Search Forum
Blog Entry# 2383121
Posted: Aug 17 2017 (23:18)
29 Responses
Last Response: Jul 31 2018 (18:18)
29 Responses
Last Response: Jul 31 2018 (18:18)
Various Projects launching and Dedications to be done tomorrow.
.
Dedications:
Koppal - Bhanapur Doubling.
Tinaighat - Londa - Shivathan Doubling.
Koppal's...
more...
.
Dedications:
Koppal - Bhanapur Doubling.
Tinaighat - Londa - Shivathan Doubling.
Koppal's...
more...
5 Public Posts - Thu Aug 17, 2017
7 Public Posts - Fri Aug 18, 2017
3 Public Posts - Sun Aug 20, 2017
I always try to notice the work on the LC on the Chitradurga-Hosapete NH that comes after MMI station. The 4 laning of the stretch is proceeding well and this LC is also being eliminated with a RoB, which is progressing well. I couldn't click pics.
-
Once I had mentioned that I noticed signals on that line. Last time I went, I was able to click pics. This stretch is the gradient which was completed last year for the smooth operation of passenger trains and is located next to the Hosapete tunnel....
more...
-
Once I had mentioned that I noticed signals on that line. Last time I went, I was able to click pics. This stretch is the gradient which was completed last year for the smooth operation of passenger trains and is located next to the Hosapete tunnel....
more...
3 Public Posts - Mon Sep 18, 2017
1 Public Posts - Tue Sep 19, 2017
1 Public Posts - Thu Sep 21, 2017
5 Public Posts - Sat Nov 04, 2017
1 Public Posts - Sun Nov 05, 2017
1 Public Posts - Wed Nov 08, 2017
1 Public Posts - Tue Jul 31, 2018