Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Vivek Express - জেগে ওঠো, সচেতন হও এবং লক্ষ্যে না পৌঁছানো পর্যন্ত থেমো না - Dip

Search Forum
<<prev entry    next entry>>
Blog Entry# 2403361
Posted: Sep 09 2017 (12:26)

5 Responses
Last Response: Sep 23 2017 (20:47)
Rail News
5590 views
1

Commentary/Human Interest
NR/Northern
Sep 09 2017 (10:25)   लापरवाही : जानकारी के बाद भी टूटी पटरी पर ट्रेन चला दी

Anupam Enosh Sarkar^~   27783 news posts
Entry# 2403361   News Entry# 315413         Tags   Past Edits
रांची राजधानी एक्सप्रेस के बेपटरी होने के पीछे रेलवे की बड़ी लापरवाही सामने आईहै। रेलकर्मियों को इस बात की जानकारी थी कि पटरी के साथ पहिए...

3 Public Posts - Sat Sep 09, 2017

3471 views
0

Sep 09 2017 (16:52)
A2Z~
A2Z~   17505 blog posts
Re# 2403361-4              
* IRly is a black box as other do not know much about Rly operation. So called 2 lac vacancies have to be studied in detail in current situation in order to ascertain that they really exist? The number of safety and inspection posts were fixed in an era when there were wooden sleepers and two rail joints every 13 meter of rail track.
* Spikes (Nails) used to came out of wooden very often due to huge impact of moving train, especially of large wheeled steam locomotives, and had to be frequently hammed back to original position. These have been replaced by pendrol clips over concrete sleepers which remain in place and do not require any hammering. So efforts required
...
more...
is reduced by several times.
* Today there are long welded rails & continuously welded rails with two rail joints in every 1-10 kms! Number of joints which need to be tightened and maintained have reduced to bare minimum. So the job of maintenance has gone down drastically but the number of post have not been reduced.
* A large number of lower staff is working as domestic help at the houses of superiors as has been reported. That practice need to be stopped and the track monitoring have to be done with mechanical and automatic means like track recording cars, drones etc. With modernisation grade D,C matric pass 12th pass type vacancies shall shrink and vacancies for professionally skilled staff to operate & maintain the modern machines shall increase.
* Not implementing pay commission (7th) is not an easy task and no RM has courage to do it!! For that IR has to be converted into PSU or corporatised.
* It does not sound good but is true that- IR shall have to delegate unskilled jobs to more efficient private sector, else it will remain in bad financial condition and continue to lose its market share to inefficient and highly polluting road & air modes. Its manpower cost of IR is already sky high at about 70% of total revenue generation and further increase is highly detrimental to its finances.

Translate to English
Translate to Hindi

1 Public Posts - Sat Sep 23, 2017
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy