Search Forum
Blog Entry# 3006471
Posted: Jan 16 2018 (11:06)
8 Responses
Last Response: Jan 17 2018 (20:07)
8 Responses
Last Response: Jan 17 2018 (20:07)
Jan 16 2018 (11:06) 17617/Tapovan Express | AWB/Aurangabad (5 PFs)
ssastronaut~
ssastronaut~ 920 blog postsDivya Marathi ans Sakaal Aurangabad Edition. 16-01-2018
#AurangabadNews
Foot by foot final location survey started for electrification of Manmad-Mudkhed-Adilabad, Purna-Akola and Parbhani-Parli section of SCR. Work will start from April 2018
#AurangabadNews
Foot by foot final location survey started for electrification of Manmad-Mudkhed-Adilabad, Purna-Akola and Parbhani-Parli section of SCR. Work will start from April 2018
4 Public Posts - Tue Jan 16, 2018
3 Public Posts - Wed Jan 17, 2018
ranges widely, from upto 72 metres for straight track, to as low as 27 metres for curvy ones.
generally, on straight tracks you'll see 72 metre span, and somewhat lower (the reduction in span is in steps of 4.5 m, so span will reduce like 67.5, 63, 58.5 etc) when there are curves.
generally, on straight tracks you'll see 72 metre span, and somewhat lower (the reduction in span is in steps of 4.5 m, so span will reduce like 67.5, 63, 58.5 etc) when there are curves.