Today's photos on Binny Mill stabling line situated south of SBC. Line laying is over both before and after girder bridges. Engine roll on was done yesterday on one line. Crossing points have to be done. The entire work work may be over by Month end. Few photos are enclosed
3 Public Posts - Wed Feb 07, 2018
2 Public Posts - Thu Feb 08, 2018
2 Public Posts - Fri Feb 09, 2018
Good info sir
Except 9 and 10 is all PF connecting that's good but almost all UBL side trains use PF 8 9 & 10 if I am not wrong.. so trains towards UBL side can't be stabled their..
Except 9 and 10 is all PF connecting that's good but almost all UBL side trains use PF 8 9 & 10 if I am not wrong.. so trains towards UBL side can't be stabled their..