Feb 14 2018 (19:00) 12023/Howrah - Patna Jan Shatabdi Express (PT) | OYR/Waria (4 PFs)
animesh^~
animesh^~ 2892 blog postsToday's incident:
Janshatabdi left Durgapur at 1700 hrs and in a mood to cover the 60 mins delay it speeded rapidly to MPS. And as usual it was crossing OYR in MPS. Just then there was a rapid sound of something breaking and emergency brakes were applied and the train stopped with a jerk. 115kmph-0kmph in 15 seconds
LP got down and checked the wheels of the train
Since...
more...
Janshatabdi left Durgapur at 1700 hrs and in a mood to cover the 60 mins delay it speeded rapidly to MPS. And as usual it was crossing OYR in MPS. Just then there was a rapid sound of something breaking and emergency brakes were applied and the train stopped with a jerk. 115kmph-0kmph in 15 seconds
LP got down and checked the wheels of the train
Since...
more...
5 Posts
HM ..IT can be a possible reason ..detailed info will be provided tomorrow
Alternator pulley got jammed
as it is ICF self generated rake, the electricity required for consumption on board coach is done by having a v-belt go over the axle of the coaches, which then helps drive the generator to generate electricity. The alternator pulley, which is the other side on which V-belt is wound, got jammed and the axle tried to pull the belt over stationary pulley, leading to heating and eventually emission of smoke.
source: elocos
as it is ICF self generated rake, the electricity required for consumption on board coach is done by having a v-belt go over the axle of the coaches, which then helps drive the generator to generate electricity. The alternator pulley, which is the other side on which V-belt is wound, got jammed and the axle tried to pull the belt over stationary pulley, leading to heating and eventually emission of smoke.
source: elocos
But why less speeds i.e., 60-70 kmph and checking of wheels at each stn
The complete report goes something like this:
(PNBE-HWH), Detained at MKA(Mokama) station for smoke emission from Coach no. 02153/CZAC/ECR due to PP side Alternator pully jammed. ACCI cut all V belts and load transfer to NPP side and worked normal. Time- 06.57-07.29(32-2=30" extra). Primary-RNCC/ECR.
It seems that the ACCI (AC coach in charge) didn't have the requisite tools to cut the V-belt with him, as things like these aren't very common. so they had to wait until a major station came up where they would find the necessary tools for the operations....
more...
(PNBE-HWH), Detained at MKA(Mokama) station for smoke emission from Coach no. 02153/CZAC/ECR due to PP side Alternator pully jammed. ACCI cut all V belts and load transfer to NPP side and worked normal. Time- 06.57-07.29(32-2=30" extra). Primary-RNCC/ECR.
It seems that the ACCI (AC coach in charge) didn't have the requisite tools to cut the V-belt with him, as things like these aren't very common. so they had to wait until a major station came up where they would find the necessary tools for the operations....
more...