Feb 15 2018 (17:05) MLDT/Malda Town (7 PFs)
Rohit Kumar Kushwaha~
Rohit Kumar Kushwaha~ 115 blog postsEscalator is being installed in full pace at PF No. 1 in Malda Town Station.
5 Public Posts - Thu Feb 15, 2018
Actually they give energisation notification early to create general awernance within the public.
Katihar Malda Court Energisation notification was released on December 2016 with no Catenery installed at Malda Court Station but the section became electrified on December 2017.
Here the synerio is different as No pole has been erected and SSP at Kaltipur is not ready at all only boundary has been made.
Katihar Malda Court Energisation notification was released on December 2016 with no Catenery installed at Malda Court Station but the section became electrified on December 2017.
Here the synerio is different as No pole has been erected and SSP at Kaltipur is not ready at all only boundary has been made.