Search Forum
Blog Entry# 3236706
Posted: Mar 25 2018 (15:54)
14 Responses
Last Response: Mar 28 2018 (09:54)
14 Responses
Last Response: Mar 28 2018 (09:54)
Mar 25 2018 (15:54) 17235/SMVT Bengaluru - Nagercoil Express (PT) | BYPL/Baiyyappanahalli (2 PFs)
MCPNBR~
MCPNBR~ 4916 blog posts9 Posts
If mentioned towards left as BAND, the line goes towards Channsandra (Guntakkal) may be misled. So wrote in the second para as "opposite direction". Anyway you know the route and you are right also.
Great capture. Is this the route that they are planning to double ? I think some amount has been allocated towards doubling between Bypnl-Hosur.
The real challenge is going to be the stretch between this station and Carmelaram. Just a few kilometres ahead before Bellandur station, there are lots of residential apartments which are extremely close to the railway tracks. Not sure how they will manage !
The real challenge is going to be the stretch between this station and Carmelaram. Just a few kilometres ahead before Bellandur station, there are lots of residential apartments which are extremely close to the railway tracks. Not sure how they will manage !
Yes. Noticed some construction activites between BYPL cabin-BAND route. Not sure doubling work or just a side filling.