Search Forum
Blog Entry# 3237879
Posted: Mar 25 2018 (22:27)
17 Responses
Last Response: Mar 27 2018 (17:52)
17 Responses
Last Response: Mar 27 2018 (17:52)
Mar 25 2018 (22:27) IMG21846-1871169/♥♥Astha Duronto Express(via sai nagar shirdi)♥♥~ 195 img trains 146 popular
1700 net green flags 10 green per TrainCustom Ratings
1700 net green flags 10 green per TrainCustom Ratings
13 Posts
halt needed at SUR na so its better and justified point but y to Remove Daund halt as its technical halt for this train LC at Shiradi and LC at Daund doesnt make change i think anyhow time for LC will be wasted but train can be run on Eloco form some more Kms until daund is train creators view. I agree SUR is Div HQ so for that he need to Give halt at SUR too.
Train can directly move to SUR as loco reversal is not needed at Daund. So I said it to save time and reduce halt. It will save that much of time 15-20 mins... Right?
hhm yup right but he using E-loco to have some fuel savings so when route after sai nagar shirdi Electrified one upto Daund i think. I know bhau their is no need of LR at Daund but LC he doing na and i understood your suggestion also as make LC with LR at shirdi and run with deisel loco until GR with skipping daund and halt at SUR right?Yes he can skip Daund if he use Desiel loco from shirdi itself with giving commercial halt at SUR
I am happy u can understand what i am trying to do i am trying to save fuel as much as possible.