Search Forum
Blog Entry# 3276586
Posted: Apr 06 2018 (19:25)
10 Responses
Last Response: Apr 07 2018 (14:48)
10 Responses
Last Response: Apr 07 2018 (14:48)
Apr 06 2018 (19:25) 12737/Gowthami SF Express (PT) | BZA/Vijayawada Junction (10 PFs)
Ananth Krishna
Ananth Krishna 12 blog posts5 Posts
Yes bro, 12727 is already running delayed with 12709 and 12763 ahead of it, now 12737 will be a big headache for it, right from SLO and biggest advantage goes to vskp duranto as it no longer trails 12737
Now 12727 Godavari is the scapegoat
Gowthami trolls Simhapuri and the sequence continuous with Padmavathi and Godavari.
In case Gowthami reaches 30mins late to BZA then Godavari will face huge troll from SC division
Gowthami trolls Simhapuri and the sequence continuous with Padmavathi and Godavari.
In case Gowthami reaches 30mins late to BZA then Godavari will face huge troll from SC division
If Gowthami is late by 30 Min, does Godavari go a head of it? If we see last week, there was delay of 12709 (3 times), 12763 (5 times) at BZA with Just 10-15 min gap. SCR made them trailed and Godavari admitted first. Won't the case with Gowthami? But essentially, you could be right Gowthami and Godavari share path from SLO to BZA and beyond, as such unless there is engine problem or something similar kind, Godavari can't reach ahead of Gowthami to BZA.
12737 would have very less delay when it enters SLO. Godavari would normally have 30 min delay till SLO. So there is no possibility of OT in any aspect.
No if Gowthami gets delayed in between SLO EE then it will effect Godavari and Godavari has to crawl behind it till SC.. as of now it's all done Godavari is new scapegoat till the TT change of either of the trains.