Search Forum
Blog Entry# 3431391
Posted: May 19 2018 (09:30)
8 Responses
Last Response: May 19 2018 (13:48)
8 Responses
Last Response: May 19 2018 (13:48)
Why do delhi metro use metal strip in place of ohe wires for underground sections?
4 Public Posts - Sat May 19, 2018
This is not exactly a third rail electrification. Typically in 'Third rail' systems, the current carrying conductor is at the rail level only, either running between the rails, or running between the tracks. The DMRC uses overhead electrification only, but uses a rigid catenary instead of the normal hanging wires for managing the tunnel sections.
3 Public Posts - Sat May 19, 2018