read more... Gatimaan Exp speed and Extension
8 Posts
Bhopal Shatabdi then should be made to run in the opposite direction !
Shatabdi Timing needs to be reversed then extension of Gaatiman is feasible.
6:00am dep from HBJ
14:20 PM NDLS
14:50 NDLS
23:00 HBJ
6:00am dep from HBJ
14:20 PM NDLS
14:50 NDLS
23:00 HBJ
AGC-JHS 160kmph track up-gradation is in progress so is BINA-Bpl, thereafter definitely AGC-JHS ka run time reduce hoga along with jhs-Bpl. Thats why they are quoting 6hr 30 mins.
i think 160 is not possible for Bina-Bhopal 130 tak possible hain kaafi steep curves hain udhar
Travel time might get further reduced for Shatabdi as well . Railway would then allow Shatabdi to run at 150 Kmph on Gatiman 160 Kmph cleared section at least !
I found IR bit stupid , they invested huge amount of money in fencing, systems and technology upgrade to run shatabdi at 150 kmph. means so much investment for a single train operation is a stupid decision. Atleast they could have converted more LHB trains on the section .. and run them all (full AC LHBs specially) at 150 Kmph on this section too... by this .. method their investment would be divided amongst more number of trains..
they...
more...
I found IR bit stupid , they invested huge amount of money in fencing, systems and technology upgrade to run shatabdi at 150 kmph. means so much investment for a single train operation is a stupid decision. Atleast they could have converted more LHB trains on the section .. and run them all (full AC LHBs specially) at 150 Kmph on this section too... by this .. method their investment would be divided amongst more number of trains..