Search Forum
Blog Entry# 3617543
Posted: Jul 10 2018 (16:07)
4 Responses
Last Response: Jul 10 2018 (17:25)
4 Responses
Last Response: Jul 10 2018 (17:25)
New Facilities/Technology
NR/Northern
सारे जहाँ से अच्छा ग्वालियर हमारा~ 55 news posts
New Delhi: Indian Railways has officially revised the arrival timings of several of its trains - a step the national transporter says it has taken because...
It is true.. On one hand the railway talk to increasing the speed of the trains and other hand the speed is being reduced.
Dreaming about bullet trains and here increasing the running time, As always IR will be in bullock cart era.
Not surprising at all... Most high density routes are running beyond capacity!!!
A lot of rewamp in the IR and massive infrastructure needs to be in place...
As far as bullet train is concerned, it will run on dedicated tracks... So it wouldn't face these problems!!!
A lot of rewamp in the IR and massive infrastructure needs to be in place...
As far as bullet train is concerned, it will run on dedicated tracks... So it wouldn't face these problems!!!