Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

No Alcohol No Drugs - the only addiction is Railfanning, to escape the negativity of the world. - Keshav Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 362344
Posted: Mar 02 2012 (16:00)

8 Responses
Last Response: Mar 05 2012 (11:16)
3246 views
0

Mar 02 2012 (16:00)   12369/Kumbh Express (PT)
 
amitkasba~
amitkasba~   945 blog posts
Entry# 362344            Tags  
what is the reason behind hauling a train in electrified route with a diesel loco??
Translate to English
Translate to Hindi

1 Public Posts - Sun Mar 04, 2012

2 Public Posts - Mon Mar 05, 2012

2066 views
0
Mar 05 2012 (08:55)
guest   0 blog posts
Re# 362344-5              
I'm agree with your point that WDM3A can haul this train easily with an average speed of 100+ But if u noted down the haulting time at MGS it is 20MIN. So in 20min of time loco can be change fro Electric to Diesel very easily hence,there is no extra wastage of time to haul by an electric engine..
Translate to English
Translate to Hindi

4 Public Posts - Mon Mar 05, 2012
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy