Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Gour Express: আমের শহর মালদা থেকে রোজ যায় শিয়ালদা - Joydeep Roy

Search Forum
<<prev entry    next entry>>
Blog Entry# 3686082
Posted: Aug 05 2018 (08:58)

6 Responses
Last Response: Aug 05 2018 (12:05)
Rail News
15132 views
0

IR Affairs
CR/Central
Aug 05 2018 (08:57)   Deccan Queen going off-track?Regular passengers believe train is losing its sheen on speed, stink and food

A2Z~   12817 news posts
Entry# 3686082   News Entry# 349589         Tags   Past Edits
While the train is often flooded with commuters, the 88-year-old train no longer enjoys the same status among regulars.
The...

5 Public Posts - Sun Aug 05, 2018

8089 views
0

Aug 05 2018 (12:05)
A2Z~
A2Z~   17505 blog posts
Re# 3686082-6              
A Ray of hope/possibilities for further reduction of journey time of DQ/Mumbai-Pune rail travel.
Futuristic projects which can revolutionize and popularize Mumbai-Pune rail travel:-
-(1) Doubling & upgradation of Karjat Panvel route (CSTM-Pune 169kms i.e. shorter by about 23kms as compared to current CSTM-Pune 192km route). It will be CSTM-Mankhurd-Vasi-Panvel-Karjat-Pune route and not CSTM-Thane-Vashi-Panvel-Pune route(186kms). (project being taken up)
-1a-In current setup of tracks
...
more...

ICF SF can do the above journey in about 175 minutes
While a nonstop SF may do in about 155-160 minutes
-1b-After construction of dedicated corridors along the route and shifting of all suburban trains on those routes
ICF SF can do the above journey in about 150-155 minutes
While a nonstop SF may do in about 135-145 minutes
Use LHB coach at 130kmph – can do nonstop in about 130-135 minutes
For the track upgraded to Gatimaan standard (160kmph) and use of tilting train sets, time can be further brought down to about 110-120 minutes
(2) Dedicated Semi high speed (200kmph) track (or 350kmph HST may be done if cost permit) with a much shorter and straighter run reducing the distance from 192 to about 150kms (Ahmedabad-Mumbai-Pune Bullet train was planned but Mumbai-Pune section was dropped to contain total project cost).
Semi high speed 200kmph dedicated with trainsets means CSTM-Pune in about 60-85 minutes and
Dedicated 350kmph line (current fastest) means Mumbai to Pune nonstop in about 35-60 minutes
(3) Hyper loop is being mulled between Mumbai & Pune with a travel time of just about 15 minutes
click here

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy