I think the height of Railway overbridge (connecting NKJ to KMZ) is too low for wiring on KTES KTE line, is wiring completed under that bridge ?
Bridge height should be minimum 4.85 for electrfication but it is 4.65
So engineering team decided to make this 10-12 meter section neutral.
And wiring is completed under the bridge.
So engineering team decided to make this 10-12 meter section neutral.
And wiring is completed under the bridge.
So how would this neutral section work ? Will trains under HOG be able to run under that section without difficulty ?
Definitely
There will be no problem as the neutral section is only for 10-12 meters
There will be no problem as the neutral section is only for 10-12 meters