Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

The purest enjoyment of life - be a RailFan.

Search Forum
<<prev entry    next entry>>
Blog Entry# 3801557
Posted: Sep 12 2018 (22:28)

10 Responses
Last Response: Feb 09 2019 (10:38)
Info Update
36005 views
17

★★
Sep 12 2018 (22:28)   NTR/Nittur (2 PFs)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Entry# 3801557            Tags  
Tumakuru - Arsikere and Chikkajajur - Yalavigi Doubling updates.
-
-
Tumakuru to Kardi.
-------------------------------
-
...
more...

Tumakuru - Gubbi is the target for this year.
-
After TK station, immediately new line is being laid on the right as said before in an another post.
The new line is laid for some distance, then gaps and again laid intermittently.
Some places ballast in spread with sleepers, some places nothing - just the old status of land being levelled and left. One or two places minor bridges are yet to be constructed.
-
Some stations new PFs are built but the line is yet to be laid.
Some stations, as I will post in subsequent blogs, the new PF is being used and the old PF's line is uprooted in total and new line is being laid, and the new is being used now.
Guess new PF lines being considered as loops doesn't need CRS.
No signs of signals.
-
I doubt if this year's target will be met.
-
-

Translate to English
Translate to Hindi

1 Public Posts - Wed Sep 12, 2018

4 Public Posts - Thu Sep 13, 2018

16772 views
8

Sep 14 2018 (01:10)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 3801557-6               Past Edits
JRU - THN target was last year, then now it's this Sep.
-
From JRU onwards everywhere work is on, but it wont be completed anytime soon.
At MYK major station modifications is on.
At
...
more...
KAG the new PF line is being used and the old one is totally removed.
At THN PF2 is made into an island PF.
-
THN - HRR is also for this year, but surely it will not be completed. The biggest hurdle is the bridge over Thungabhadra, where even pillars are not ready.
-
At DVG the bottleneck towards UBL needs to be sorted out to lay another track. Also I saw that the cabin has the old type lever type of track switching.
Just some ROB is under construction.
-
Was surprised to see the new line towards KTY having a speed of 80!
-
Pics 30, 31 - I noticed a new station just recently - - KMPS. It turned out be just a small station from where an industry line deviates.
-
The pillar construction is completed for the bridge over Varada river.
-
Yalavigi has still the old British era station building.
Travel tip - /blog/post/3804898
-

Translate to English
Translate to Hindi

3 Public Posts - Fri Sep 14, 2018

1 Public Posts - Sat Feb 09, 2019
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy