Search Forum
Blog Entry# 3846127
Posted: Sep 27 2018 (18:21)
6 Responses
Last Response: Sep 28 2018 (09:45)
6 Responses
Last Response: Sep 28 2018 (09:45)
Looking at the blockage to Electrification in BGP JMP section 1) Rob at Jmp @BGP side- needs to dismantled old one due to lower height and construction of new is too slow looks far from near future completion.
2) Tunelling work of main hill in and out has still not begun and work progress is too slow without operational of this double line tunnel electrification will not be possible.
++But Bhagalpur to lailakh Mamalka 15 km section double line is ready for CRS which will happen soon next month.
++Kahalgaon...
more...
2) Tunelling work of main hill in and out has still not begun and work progress is too slow without operational of this double line tunnel electrification will not be possible.
++But Bhagalpur to lailakh Mamalka 15 km section double line is ready for CRS which will happen soon next month.
++Kahalgaon...
more...
1 Posts
Maine bola bonidanga link cabin to sahibganj pe holes cemented hone kam katam ho gya hai poles fixing is in progress and bonidanga link cabin to bhararwa poles has been kept not fixed at seen by me in august. In jamalpur main issue is with tunnel more than rob as old tunnel height is too low for passing of electric poles and wires.
Railways se koi notification nahi aaya hai ki Old tunnel se OHE nahi ja sakta hai. Sabhi log apne Man se hi tunnel ki height measure kar rahe hain. Aur ise obstacle bata rahe hai. tunnel ke paas bhi electrification poles fix kar diya gaya hai.