Search Forum
Filters:
Page# 3 Blog Entries
Nov 22 2023 (10:38) SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
Aki_Creator_RF~
Aki_Creator_RF~ 1964 blog posts🚂📢 As part of augmentation of coach maintenance facility at #Bengaluru #Coaching #depot
✅Extension of sick line shed extension towards #Mysuru end in progress.
✅Extension of sick line shed extension towards #Mysuru end in progress.
Looking at the blockage to Electrification in BGP JMP section 1) Rob at Jmp @BGP side- needs to dismantled old one due to lower height and construction of new is too slow looks far from near future completion.
2) Tunelling work of main hill in and out has still not begun and work progress is too slow without operational of this double line tunnel electrification will not be possible.
++But Bhagalpur to lailakh Mamalka 15 km section double line is ready for CRS which will happen soon next month.
++Kahalgaon...
more...
2) Tunelling work of main hill in and out has still not begun and work progress is too slow without operational of this double line tunnel electrification will not be possible.
++But Bhagalpur to lailakh Mamalka 15 km section double line is ready for CRS which will happen soon next month.
++Kahalgaon...
more...
2 Public Posts - Thu Sep 27, 2018
3 Public Posts - Fri Sep 28, 2018
First look of both BRC wap5(30044,30045) at BRC SHED
Source: Flicker
Pic Taken by: Suraj Gangber
Uploaded by: aseem30031
we can see PROUDLY written BRC logo on the side of the Loco. :-D
Source: Flicker
Pic Taken by: Suraj Gangber
Uploaded by: aseem30031
we can see PROUDLY written BRC logo on the side of the Loco. :-D
25 Public Posts - Sat Dec 17, 2011
4 Public Posts - Sun Dec 18, 2011
3 Public Posts - Sun Dec 18, 2011
1 Public Posts - Sun Jan 15, 2012
1 Public Posts - Sun Jan 22, 2012
1 Public Posts - Wed Jan 25, 2012
Page# 3 Blog Entries