Search Forum
Blog Entry# 3932076
Posted: Oct 23 2018 (21:20)
11 Responses
Last Response: Oct 24 2018 (10:42)
11 Responses
Last Response: Oct 24 2018 (10:42)
Commentary/Human Interest
NR/Northern
Anupam Enosh Sarkar^~ 27783 news posts
AGRA: Hours after Integral Coach Factory (ICF), Chennai announced releasing the ‘Train 18’ in a week’s time for trial, the Research Designs and Standards Organisation (RDSO)...
6 Posts
4B and 4D are rated for a maximum design speed of 135kmph, but can probably hit higher speeds with lesser loads.
22691/92 had clearance for 120kmph only with twin ALCOs, though i believe that was only in trials and not commercial operations.
22691/92 had clearance for 120kmph only with twin ALCOs, though i believe that was only in trials and not commercial operations.
Yes only for trials they conducted due to single line section it was not cleared to run at 120 kmph though the trial was successful.
Why BE-MB is chosen for first trial. Even talgo trial was first conducted here only??