Nov 17 2018 (19:28) BAY/Ballari Junction (Bellary) (4 PFs)
SteelCityRF^~
SteelCityRF^~ 27572 blog postsRail fanning at #BallariJnouter (towards Guntakal side) on #November15th2018
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
23 Public Posts - Sat Nov 17, 2018
1 Public Posts - Sun Nov 18, 2018
I dont think gtl bay RE will be over by Dec it may pull on upto feb bcoz still work has not started at Bay stn. For just wiring mys stn they took 3 months whereas here still OHE poles have to be laid and TSS work must be done easily it will take minimum 4 to 5 months or if the work is going very fast then approx around 3 months it will take to complete. What im thinking is as hpt kbl RE work is going at rapid pace they may wait for that to complete and commission entire gtl kbl section at once.
5 Public Posts - Sun Nov 18, 2018
43 Public Posts - Mon Nov 19, 2018