Nov 17 2018 (19:28) BAY/Ballari Junction (Bellary) (4 PFs)
SteelCityRF^~
SteelCityRF^~ 27572 blog postsRail fanning at #BallariJnouter (towards Guntakal side) on #November15th2018
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
23 Public Posts - Sat Nov 17, 2018
7 Public Posts - Sun Nov 18, 2018
1 Public Posts - Mon Nov 19, 2018
Already Hpt ubl and ld mrj RE is going at rapid pace and tenders for Sbc Ubl line will be finalised by Jan end and Core will take less than 5 years to electrify the entire stretch. But can't say when hotgi gdg RE may start being until RE starts in Klbg Sur section it wont start here. But one thing in another 5 years Swr will be on par with Scr and Sr in terms of electrified routes.