Nov 17 2018 (19:28) BAY/Ballari Junction (Bellary) (4 PFs)
SteelCityRF^~
SteelCityRF^~ 27720 blog postsRail fanning at #BallariJnouter (towards Guntakal side) on #November15th2018
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
23 Public Posts - Sat Nov 17, 2018
7 Public Posts - Sun Nov 18, 2018
31 Public Posts - Mon Nov 19, 2018
Did you mean loop lines of goods section will be removed? What will they build there if they are removed? Those loop lines are nearer to Sirguppa road (NH) and act as good loading point or unloading point. Also there are foundations for OHE portals adjacent these loop lines. If they are going to remove those loop lines, then those foundations might not have been done there.