Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Regular people go to see Taj Mahal. RailFans go to see Ghaziabad Jn. - Praveen

Search Forum
<<prev entry    next entry>>
Blog Entry# 4269872
Posted: Mar 23 2019 (13:05)

16 Responses
Last Response: Mar 28 2019 (07:34)
General Travel
118610 views
6

Mar 23 2019 (13:05)   KD/Kundarki (2 PFs)
Divyansh~
Divyansh~   159 blog posts
Entry# 4269872            Tags   Past Edits
Electrification Update. MB-CH-BE-ALJN
Almost 80% work done at kundarkhi, all pole errected even wires got streached.
I think only Sub stations SSP'S for power supply are left with.
But no sign of Sbu power station SSP'S on whole section.
Translate to English
Translate to Hindi

11 Posts

17862 views
2

Mar 28 2019 (01:27)
Faraz_IIT_Roorkee
Faraz_IIT_Roorkee   167 blog posts
Re# 4269872-12               Past Edits
Excellent job Divyansh...I myself travelled on 21st march but the train was crowded and I couldn't manage to click pictures but the progress I noticed was very much rapid especially in the past few months.
The progress at chandausi railway station was such that the holes were dug on plateform 1 and 2, this means that they want to electrify mainline and immediate loop lines only so that the CRS can be done and electric traction can be put in picture ASAP.
With this amount of work, I think within 60 days,
...
more...
first stretch i.e., MB-CH section will be operational.

Translate to English
Translate to Hindi

17744 views
0

Mar 28 2019 (01:27)
Faraz_IIT_Roorkee
Faraz_IIT_Roorkee   167 blog posts
Re# 4269872-13               Past Edits
The progress at chandausi railway station was only seen on plateform 1 and 2, this means that they want to electrify mainline and immediate loop lines only so that the CRS can be done and electric traction can be put in picture ASAP.
With this amount of work, I think within 60 days, first stretch i.e., MB-CH section will be operational.
Translate to English
Translate to Hindi

18964 views
0

Mar 28 2019 (01:35)
Faraz_IIT_Roorkee
Faraz_IIT_Roorkee   167 blog posts
Re# 4269872-14               Past Edits
I have not travelled on CH-BE section, if anyone has any update please provide. Actually, I turned my way to Aligarh with 54352 and saw absolutely no progress on AL-CH section.
The way of operation was very poor, every single person can stop the train anywhere by disconnecting pressure pipes. Also, ball token system is still in place which is enough to irritate the passengers.
Roadways buses are much better to travel than these century old system operated train in this part and sooner or later if things are not improved, railways
...
more...
are going to lose much of its patronage to Air and road travel.
The progress at Chandausi railway station was such that the holes were dug on plateform 1 and 2, this means that they want to electrify mainline and immediate loop lines only so that the CRS can be done and electric traction can be put in picture ASAP.
With this amount of work, I think within 60 days, first stretch i.e., MB-CH section will be operational.

Translate to English
Translate to Hindi

17924 views
1

Mar 28 2019 (01:37)
Faraz_IIT_Roorkee
Faraz_IIT_Roorkee   167 blog posts
Re# 4269872-15               Past Edits
No progress on AL-CH section. Even, ball token system is still in use decreases the operational capacity to such an extent that the average speed falls between 20-30 kmph only
Translate to English
Translate to Hindi

18185 views
0

Mar 28 2019 (07:34)
shanu1234545~
shanu1234545~   1376 blog posts
Re# 4269872-16               Past Edits
No progress on BE-CH section till 19 march
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy