Almost 80% work done at kundarkhi, all pole errected even wires got streached.
I think only Sub stations SSP'S for power supply are left with.
But no sign of Sbu power station SSP'S on whole section.
Almost 80% work done at kundarkhi, all pole errected even wires got streached.
I think only Sub stations SSP'S for power supply are left with.
But no sign of Sbu power station SSP'S on whole section.
4 Public Posts - Sat Mar 23, 2019
4 Public Posts - Sun Mar 24, 2019
3 Public Posts - Mon Mar 25, 2019
2 Public Posts - Thu Mar 28, 2019
I have not travelled on CH-BE section, if anyone has any update please provide. Actually, I turned my way to Aligarh with 54352 and saw absolutely no progress on AL-CH section.
The way of operation was very poor, every single person can stop the train anywhere by disconnecting pressure pipes. Also, ball token system is still in place which is enough to irritate the passengers.
Roadways buses are much better to travel than these century old system operated train in this part and sooner or later if things are not improved, railways...
more...
The way of operation was very poor, every single person can stop the train anywhere by disconnecting pressure pipes. Also, ball token system is still in place which is enough to irritate the passengers.
Roadways buses are much better to travel than these century old system operated train in this part and sooner or later if things are not improved, railways...
more...
2 Public Posts - Thu Mar 28, 2019